Calculating the load classes of a scaffold correctly

Scaffolding load classes are among the most important, yet at the same time most frequently misunderstood, fundamentals of scaffolding construction. They determine the loads that a scaffold may safely bear per level – in other words, how many people may work on it at the same time, whether materials may be stored on it, and which types of work are permitted in accordance with the standards.

Scaffolding load classes – interactive calculator

Calculate load classes, understand load classes, access the practical table – in accordance with DIN EN 12811–1.

2 Personen
80 kg

Calculation details

Passenger load2,0 kN
material load0,8 kN
Total load2,8 kN
Scaffold area1,83 m²
Area load1,53 kN/m²

Recommended load class

LK 3
Baustellen-Standard - 2,00 kN/m²
Putz-, WDVS- und Fassadenarbeiten
✓ Lastklasse ausreichend für diese Kombination
LK 1
= gehen
LK 2
= arbeiten
LK 3
= arbeiten + Material
LK 4 - 6
= Industrie / Sonder

Alle Lastklassen nach DIN EN 12811‑1 im direkten Vergleich:

All
LK 1 - 3 (Wohnbau)
LK 4 - 6 (Industrie)
Load classPermissible loadTypical usesPermittedNot permitted
LK 10,75 kN/m²
≈ 75 kg/m²
Routine checks, inspections✓ People, hand tools✕ Materials storage
LK 21,50 kN/m²
≈ 150 kg/m²
Painting, cleaning✓ 1–2 people, light tools✕ Pallets, sacks, insulation boards
LK 32,00 kN/m²
≈ 200 kg/m²
Plaster, ETICS, façade✓ Several people + equipment -
LK 43,00 kN/m²
≈ 300 kg/m²
Natural stone, heavy materials✓ Heavy equipment, machinery -
LK 54,50 kN/m²
≈ 450 kg/m²
Industry, plant engineering✓ Heavy-duty operation -
LK 66,00 kN/m²
≈ 600 kg/m²
Special loads, heavy-duty assembly✓ Maximum load -
ⓘ Wichtig: Die Lastklasse gilt pro Gerüstlage - nicht für das gesamte Gerüst. Lastklasse muss am Gerüstschild ausgewiesen sein.

Welche Lastklasse für welche Arbeit? Praxisübersicht nach Gewerk:

Type of workLoad classPermissible loadNote
Inspection round / InspectionLK 10,75 kN/m²Inspection only, no tools
Painting work (excluding materials store)LK 21,50 kN/m²Max. 1–2 people + paint bucket
Cleaning workLK 21,50 kN/m²Lightweight equipment permitted
Minor maintenance workLK 21,50 kN/m²No pallets / sacks
Plastering workLK 32,00 kN/m²Most common construction defects in residential buildings
External Thermal Insulation Composite System (ETICS) / Façade insulationLK 32,00 kN/m²+ Note the width class W09
General façade workLK 32,00 kN/m²Standard detached house / residential construction
Natural stone / heavy tilesLK 43,00 kN/m²Allow for heavier materials
Industry / Plant EngineeringLK 5 - 64,50 - 6,00 kN/m²Involve a structural engineer
⚠ Sicherheitsregeln: Material nicht stapeln wenn nicht berechnet · Lastklasse muss am Gerüstschild stehen · Breitenklasse (z. B. W09 bei WDVS) ist zusätzlich verpflichtend
Was ist eine Gerüstlastklasse?
Gerüstlastklassen legen fest, welche Lasten ein Gerüst pro Lage sicher aufnehmen darf - also wie viele Personen gleichzeitig arbeiten dürfen, ob Material gelagert werden kann und welche Arbeiten normkonform zulässig sind. Geregelt ist das in der DIN EN 12811‑1.
Was ist der Unterschied zwischen LK 1, 2 und 3?
LK 1 (0,75 kN/m²) ist nur für Begehung. LK 2 (1,50 kN/m²) erlaubt leichte Arbeiten ohne Materiallagerung. LK 3 (2,00 kN/m²) ist der Baustellen-Standard und erlaubt mehrere Personen plus Arbeitsmaterial - die häufigste Lastklasse im Wohnbau.
How do I work out the required load class?
Personenlast (1 Person ≈ 1,0 kN) + Materiallast (100 kg ≈ 1,0 kN) = Gesamtlast. Diese durch die Gerüstfläche (Länge × Breite) teilen. Das Ergebnis in kN/m² mit der Tabelle vergleichen. Unser Rechner (Tab 1) macht das automatisch.
Does the load class apply to the entire scaffolding?
Nein - die Lastklasse gilt immer pro Gerüstlage, nicht für das gesamte Gerüst. Auf verschiedenen Lagen können theoretisch unterschiedliche Lastklassen gelten, wenn entsprechend ausgewiesen.
Welche Lastklasse brauche ich für WDVS / Fassadendämmung?
Für WDVS-Arbeiten ist mindestens Lastklasse 3 (2,00 kN/m²) erforderlich. Zusätzlich ist die Breitenklasse W09 verpflichtend, damit das Gerüst breit genug für Dämmpakete ist. CETRAC berät dich kostenlos zur richtigen Auswahl.
Muss die Lastklasse am Gerüst ausgewiesen sein?
Ja - die Lastklasse muss am Gerüstschild deutlich sichtbar stehen. Das ist gesetzlich vorgeschrieben und bei Kontrollen relevant. Falsch gewählte oder nicht ausgewiesene Lastklassen können zu rechtlichen Problemen und Sicherheitsrisiken führen.

Scaffolding load classes – interactive calculator

Calculate load classes, understand load classes, access the practical table – in accordance with DIN EN 12811–1.

Number of people on site 2 people Load (kg) 80 kg Scaffolding bay length (m) Scaffolding width (m)

Calculation details

Passenger load2,0 kNmaterial load0,8 kNTotal load2,8 kNScaffold area1,83 m²Area load1,53 kN/m²

Recommended load class

Load class 3Baustellen-Standard – 2.00 kN/m² Plastering, ETICS and façade work✓ Load class sufficient for this combination LK 1= walkingLK 2 = workingLK 3 = working + materialsLK 4 – 6= industrial / specialFree consultationBuy scaffolding

A direct comparison of all load classes in accordance with DIN EN 12811–1:

All LK 1 – 3 (Residential) LK 4 – 6 (Industrial)
Load classPermissible loadTypical usesPermittedNot permitted
LK 10.75 kN/m²
≈ 75 kg/m²
Routine checks, inspections✓ People, hand tools✕ Materials storage
LK 21.50 kN/m²
≈ 150 kg/m²
Painting, cleaning✓ 1–2 people, light tools✕ Pallets, sacks, insulation boards
LK 32.00 kN/m²
≈ 200 kg/m²
Plaster, ETICS, façade✓ Several people + equipment -
LK 43.00 kN/m²
≈ 300 kg/m²
Natural stone, heavy materials✓ Heavy equipment, machinery -
LK 54.50 kN/m²
≈ 450 kg/m²
Industry, plant engineering✓ Heavy-duty operation -
LK 66.00 kN/m²
≈ 600 kg/m²
Special loads, heavy-duty assembly✓ Maximum load -
ⓘ Important: The load class applies to each level of the scaffolding – not to the scaffolding as a whole. The load class must be indicated on the scaffolding sign. Free consultation

Which load class for which job? A practical guide by trade:

Type of workLoad classPermissible loadNote
Inspection round / InspectionLK 10,75 kN/m²Inspection only, no tools
Painting work (excluding materials store)LK 21,50 kN/m²Max. 1–2 people + paint bucket
Cleaning workLK 21,50 kN/m²Lightweight equipment permitted
Minor maintenance workLK 21,50 kN/m²No pallets / sacks
Plastering workLK 32,00 kN/m²Most common construction defects in residential buildings
External Thermal Insulation Composite System (ETICS) / Façade insulationLK 32,00 kN/m²+ Note the width class W09
General façade workLK 32,00 kN/m²Standard detached house / residential construction
Natural stone / heavy tilesLK 43,00 kN/m²Allow for heavier materials
Industry / Plant EngineeringLK 5 - 64,50 - 6,00 kN/m²Involve a structural engineer
⚠ Safety rules: Do not stack materials unless specified · The load class must be indicated on the scaffolding sign · The width class (e.g. W09 for ETICS) is also mandatory Buy scaffolding from 10 €/m²Request a consultationWhat is a scaffolding load class? Scaffolding load classes specify the loads that a scaffold may safely bear per level – in other words, how many people may work on it at the same time, whether materials may be stored on it, and which types of work are permitted in accordance with the standards. This is regulated by DIN EN 12811–1. What is the difference between load classes 1, 2 and 3? Load class 1 (0.75 kN/m²) is for access only. Load class 2 (1.50 kN/m²) permits light work without the storage of materials. LK 3 (2.00 kN/m²) is the construction site standard and permits several people plus work materials – the most common load class in residential construction. How do I calculate the required load class?Person load (1 person ≈ 1.0 kN) + material load (100 kg ≈ 1.0 kN) = total load. Divide this by the scaffolding area (length × width). Compare the result in kN/m² with the table. Our calculator (Tab 1) does this automatically. Does the load class apply to the entire scaffolding? No – the load class always applies per scaffolding level, not to the entire scaffolding. In theory, different load classes may apply to different levels, provided this is specified accordingly. Which load class do I need for ETICS / façade insulation? For ETICS work, load class 3 (2.00 kN/m²) is required as a minimum. In addition, width class W09 is mandatory to ensure the scaffolding is wide enough for insulation packages. CETRAC offers free advice on making the right choice. Does the load class have to be indicated on the scaffolding? Yes – the load class must be clearly visible on the scaffolding sign. This is a legal requirement and is relevant during inspections. Incorrectly selected or unindicated load classes can lead to legal problems and safety risks.

Load classes for scaffolding, explained simply

In practice, incorrectly selected load classes can quickly lead to overloading, safety risks and legal problems. Conversely, selecting the correct load class ensures clear procedures, safe working conditions and the smooth running of projects. This is precisely where this guide comes in.

On this page, we explain in a clear and practical way,

  • what scaffolding load classes are,
  • in which the individual classes differ,
  • which load class is required for which tasks
  • and how to avoid common planning and implementation errors.

Whether it’s façade renovation, painting or the installation of an external thermal insulation composite system (ETICS): with the right knowledge, you can make informed decisions and ensure that your scaffolding is used safely, in accordance with standards and efficiently.

Differences between scaffolding load classes

The difference between load classes 1, 2 and 3 lies in the permissible load per scaffolding level and, consequently, in the types of work permitted on the scaffolding. This is regulated by DIN EN 12811–1.

Scaffolding load classes 1 – 3: a direct comparison (DIN EN 12811–1)

Scaffolding load classes – overview

What load can be placed on which scaffolding? EN 12811 · Version 04/2026

cetrac.com · Second-hand branded scaffolding from 10 €/m² Stand:04/2026 Prices may vary · Leipzig

Further reading:

Load classes explainedFree consultation

Step-by-step: Calculating the load class correctly

1. Record all loads (per scaffold level)

Du berücksichtigst immer die ungünstigste Nutzungssituation.

(a) Passenger load

  • Practical value: 1 person ≈ 1.0 kN (≈ 100 kg)
  • Example: 2 people → 2.0 kN

(b) Material load

  • Bags (plaster, mortar, insulation)
  • Farbeimer, Fliesen, Werkzeuge
    Gewicht in kg → in kN umrechnen
    Faustformel:
    100 kg ≈ 1,0 kN

c) Equipment / Machinery

  • Mixing equipment, cutting machines, ETICS kits, etc.

2 Convert load to area

DIN distinguishes between surface loads (kN/m²).

Formula:

Total load (kN) ÷ scaffolding area in use (m²) = area load (kN/m²)

Example:

  • 2 people → 2.0 kN
  • Material → 1.5 kN
  • Total → 3.5 kN

Scaffolding area:

  • 2.5 m long × 0.73 m wide = 1.83 m²

3,5 kN ÷ 1,83 m² = 1,91 kN/m²

3. Select the appropriate load class in accordance with DIN EN 12811

Typical load classes in practice

Important safety rules (often overlooked)

  1. The load class applies to each level of the scaffolding, not to the entire scaffold
  2. Do not stack materials unless specified
  3. The load class must be shown on the scaffolding sign
  4. The width class (e.g. W09 for ETICS) is also mandatory

Click here for instructions on how to erect scaffolding correctly:

Putting up scaffolding: Instructions

FAQ: Scaffolding load classes explained simply

Scaffolding load classes specify the maximum load that a scaffold level may safely bear per square metre. They determine how many people may work on the scaffold at the same time, whether materials may be stored on it, and which types of work are permitted in accordance with the standards.

Load classes are specified in DIN EN 12811-1. There are a total of 6 load classes, ranging from light foot traffic (1) to heavy industrial loads (6).

Load class 2 is generally sufficient for simple painting and cleaning work. This allows for 1–2 people using light tools, but does not permit the permanent storage of materials such as pallets or sacks.

Die Lastklasse 3 ist der Standard im Wohnungsbau und bei Fassadenarbeiten wie Putz oder WDVS-Montage. Sie erlaubt mehrere Personen sowie praxisübliche Mengen an Arbeitsmaterial.

The calculation is carried out in three steps:

  1. Record all loads (people, materials, equipment)
  2. Divide the total load by the scaffolding area in use → Result in kN/m²
  3. Select the appropriate load class in accordance with DIN EN 12811

Rule of thumb: 100 kg ≈ 1.0 kN

No – the load class applies to each level of the scaffolding, not to the scaffolding as a whole. This is one of the most common mistakes made in practice.

The load class must be clearly indicated on the scaffolding sign. In addition, the width class (e.g. W09 for ETICS work) must also be specified.

For heavy materials such as natural stone or tiles, load class 4 or 5 is recommended. For industrial applications involving special loads, load class 6 (6.00 kN/m²) is used.

Choosing the wrong load class can lead to overloading, safety risks and legal problems. In the worst-case scenario, the scaffolding could collapse. The correct load class is therefore not merely a recommendation, but a safety requirement.

Frequently asked questions

What are scaffolding load classes?
Scaffolding load classes specify the maximum load that a scaffold level may safely bear per square metre. They determine how many people may work on the scaffold at the same time, whether materials may be stored on it, and which types of work are permitted in accordance with the standards.
Which standard governs the load classes for scaffolding?
Load classes are specified in DIN EN 12811-1. There are a total of 6 load classes, ranging from light foot traffic (1) to heavy industrial loads (6).
What load class do I need for painting work?
Load class 2 is generally sufficient for simple painting and cleaning work. This allows for 1 to 2 people using light tools, but does not permit the permanent storage of materials such as pallets or sacks.
What is the standard load class for façade work?
Load class 3 is the standard in residential construction and for façade work such as plastering or the installation of external thermal insulation composite systems (ETICS). It allows for several people as well as standard quantities of working materials.
How do I work out the required load class?
In three steps: 1. Record all loads (people, materials, equipment). 2. Divide the total load by the scaffolding area in use; the result is in kN per m². 3. Select the appropriate load class in accordance with DIN EN 12811. Rule of thumb: 100 kg corresponds to approximately 1.0 kN.
Does the load class apply to the entire scaffolding?
No, the load class applies to each level of the scaffolding, not to the scaffolding as a whole. This is one of the most common mistakes made in practice.
What information must be included on a scaffolding sign?
The load class must be clearly indicated on the scaffolding sign. In addition, the width class (for example, W09 for ETICS work) must also be specified.
What load class do I need for heavy materials such as natural stone?
For heavy materials such as natural stone or tiles, load class 4 or 5 is recommended. For industrial applications involving special loads, load class 6 (6.00 kN per m²) is used.
What happens if the load class is incorrect?
Choosing the wrong load class can lead to overloading, safety risks and legal problems. In the worst-case scenario, the scaffolding could collapse. The correct load class is therefore not merely a recommendation, but a safety requirement.