Replace your frame scaffolding with the MGS version
Health and safety regulations require an advance guardrail to be in place before assembly and dismantling. With traditional frame scaffolding, this is a labour-intensive process – with MGS, it is already built in. That is why we accept your existing frame scaffolding as part payment.
We are exchanging frame scaffolding in widths of 0.70 and 1.00 metres – for example, Plettac SL 70 and SL 100, Layher Blitz, Hünnebeck Bosta or Rux Super – for the CETRAC MGS pole-type scaffolding.
How to swap
For the first 25 customers: You hand in your scrap material, and we’ll supply MGS – you’ll only be charged for the additional parts.
| You give | You will receive |
|---|---|
| 1 Frame | 1 MGS standard |
| 1 Guardrail to match the frame | 1 MGS guardrails – guardrails for the tilting lock quick-release fastener (MGS-A) or ‘bear guardrails’ for the tilting pin (MGS-K) |
| 2 used diagonal braces | 1 new diagonal brace |
| 2 second-hand toe boards | 1 new MGS toe board |
What you keep: your own decks, brackets and other accessories remain your property and continue to be used with MGS-A – only frames, guardrails, diagonal braces and toe boards are exchanged. For Plettac and Rux frame scaffolding, the MGS standard is also available with a tilting lock – then you keep your diagonal braces as well.
Parts required specifically for the stem version – such as support bars and longitudinal bars – are not included in the exchange and will be charged separately.
Every scaffolder knows: sooner or later, the switch is a must
Without advance guardrail, the crew works unprotected on every lift during erection and dismantling – it is only a matter of time before something happens. That is why every scaffolder knows: the switch to scaffolding with advance guardrail is coming, sooner or later.
Until now, the investment was the obstacle
Buying new material and parting with existing frame scaffolding below its value – this high investment has so far kept most companies from switching.
CETRAC makes the switch affordable – because we can
We are strong in marketing used scaffolding. We bring your frame scaffolding to market at the best possible price and credit this value directly against your new MGS. This turns a major investment into an affordable switch – with the first-customer offer, you pay only for the additional parts.
A solution for every system
- mMGS-A is also available with metric guardrails
We also accept Plettac, Hünnebeck or Rux frame scaffolding in exchange. - 1:1We always exchange original Layher scaffolding parts 1:1
For all scaffolding contractors.
Eisenberger Gerüstbau is switching to MGS-A
We were able to secure Eisenberger Gerüstbau GmbH as our first client: there, a total of at least 400,000 m² of facade scaffolding will be replaced with the MGS-A system.
Nico Labes, the managing director of Eisenberger Gerüstbau GmbH, was immediately impressed by the MGS-A quick-release fastener. In his view, it is the best system with a leading guardrail currently available on the market.
How the exchange works
- List your stockCount the frames, guardrails, diagonal braces and toe boards – enter the figures in the exchange calculator or enquire directly.
- Agree the exchangeWe check your details and agree the exchange ratio with you – usually 1:1 – along with the additional parts the standard variant requires.
- Selling off old materialWe bring your trade-in material to market – in stages if you wish, even spread over several years.
- Receive new scaffoldingOnce your swap material has been sold, we deliver MGS-A (available from 2027, DIBt approval procedure not yet completed). You keep using decks, brackets and accessories.
Why it pays to start today
We exchange – we do not pre-finance
We exchange your material at the agreed ratio, usually 1:1. First we sell your trade-in material, and after the sale we deliver your new scaffold. The sooner the sale begins, the sooner your MGS is in your yard.
Also for companies in Germany
Selling takes time – and it runs in parallel with the approval procedure. The DIBt approval procedure for MGS has not yet been completed; approval is expected in the foreseeable future. Start now and lose no time.
Predictable for tax purposes
We can spread the sale of your old material over several years. This can make sense for tax purposes, for example if largely written-off material would otherwise generate a high profit in a single year. Please check with your tax adviser whether this applies to your business.
Calculation example
| You give | You will receive |
|---|---|
| 100 Frame | 100 MGS handles |
| 100 Guardrail | 100 MGS guardrail |
| 60 Diagonal braces | 30 new diagonal braces |
| 120 Toe boards | 60 new toe boards |
Sample quantities. Additional parts such as crossbars and longitudinal bars are not included in the exchange. Only these additional parts will be charged for the first 25 customers.
Two versions – our recommendation: MGS-A
- AMGS-A with tilting lock Favourite
The star of the show when it comes to leading guardrails – it doesn’t get any quicker than this. Attaching and detaching in the blink of an eye saves the scaffolder time and money on every bay. Patent pending. - KMGS-K with a tilt pin
Tried-and-tested tilt-pin connection on the handrail post with ‘Bärchen’ handrails – tried and tested, but slower to attach and detach than the MGS-A.
DIBt approval procedure not yet completed: Available from 2027. Approval is expected in the foreseeable future – a plus for Germany; in most other countries it is not required. Until then in Germany: individual proof of stability – we will advise you.
Calculate exchange
This is a guide price; the material has not been tested. We will specify the bolts and any other additional parts in the quotation.
Hook it on? Let it drop – that’s it.
With the tilting lock quick-release fastener, the guardrail is simply placed over the tilting lock from above and allowed to drop into place. It locks securely in place straight away – no fastening, no threading, no tools required.
When dismantling, the fitter stands one level lower and cannot reach the upper tilting lock – nor does he need to: he lowers the first standard arm – the opposite movement to that used during assembly – and removes the guardrail by its tilting lock. At the other end, where the standard is still in place, he lifts the guardrail slightly and removes it – without operating the tilting lock. Of course, if you prefer, you can also remove the guardrail at any time by lifting the tilting lock.
This means that the advance guardrail moves along bay by bay in a single pass – both during assembly and dismantling. Every second saved per bay adds up to hours on the building site.
Video with no sound. The version shown is currently undergoing the approval process.
Three solutions for advance guard rails compared
The video compares the three solutions on the market and shows how to switch your frame scaffolding to MGS-A.
Video with subtitles.
Request an exchange
First-time customer offer: 24 out of 25 places still available – swap 1 for 1; only the additional parts will be charged.